Refitting the Nav Station

I’ve been looking forward to typing up this blogpost for a while, but I…


The BIG post about the BIG winter refit

This post has been inevitable. As the amount of work we took on during the…


Installing a holding tank - Part three

This is a series of posts which details the work which was required to…


Installing a holding tank - Part two

This is a series of posts which details the work which was required to…


Installing a holding tank - the first steps

This is a series of posts which details the work which was required to…


The state of things onboard - mid winter

We’ve made it past mid-winter here in the Baltics. The season has…


Hauling out in the Baltics

I got the question from an Instagram follower the other day on the work…


Building a refrigerator/icebox, part 5 - Countertops, fiddles and finish

In parallel with mounting the insulating panels I worked on preparing the…


Building a refrigerator/icebox, part 4 - Measure twice, cut once

Once the space for the box was prepared I could start measuring for the…


Building a refrigerator/icebox, part 3 - Work begins, insulation and countertops

The plans and sketches for the fridge unfolded as I started to dismantle…